Can I have a hot dog stand?
Yes, with a sidewalk cart food vendor license. Location rules apply.
MPLS § 188.510
Illustrative example — general information, not legal advice. Verify against the current code before acting.

Not every address has a city code

Ask about a setback on unincorporated county land and a city-code search finds nothing — or finds the nearest city's rule, which reads exactly as confident as the right one. City Code Assistant starts from the bodies that actually govern an address, searches the codes it has indexed for them, and names the one an answer is standing on.

  • What governs

    The chain for Minneapolis

    City of Minneapolis → State of Minnesota. Minneapolis Code of Ordinances — indexed and searched; Minnesota Statutes — cited when a rule belongs there rather than to a local ordinance.

  • Whose rule

    Named on every answer

    City ordinance answers most questions here. When the rule is not the city's — a state surcharge, a statewide building requirement — the answer cites it as Minnesota Statutes instead of presenting it as city code.

  • When it can't be grounded

    It says so

    No guessing and no padding. An answer that cannot be tied to a section says which searches came back empty and points you at Planning Department, Inspections, 311 — the offices that can actually decide it.

Free — 5 a day
Pro $29 — monthly, unlimited
Team — talk to us

Common Minneapolis code questions

General information only — not legal, engineering, or professional advice. The code changes; figures below may be out of date. Always verify against the current code and with the authority having jurisdiction before you act.

How tall can a fence be in Minneapolis?
Up to 6 ft in interior side and rear yards, but only 4 ft in a front yard or a corner (street-side) yard — and a corner fence must stay clear of the intersection sight triangle (MPLS § 535.310). Reference only, not legal advice; verify against the current code before you build.
Do I need a permit for a shed in Minneapolis?
A detached accessory structure of 200 sq ft or more needs a building permit (MPLS § 91.20). Regardless of size it must meet accessory setbacks — about 5 ft from an interior side line, 3 ft from the rear, and a 14 ft height cap (MPLS § 537.40). Verify against the current code before you build.
What are the setback requirements for a house in Minneapolis?
Required yards vary by zoning district. In R1 (single-family) the principal structure needs about a 25 ft front yard, 6 ft interior side yard, and 25 ft rear yard, with a 35 ft height limit (MPLS § 546.90). Other districts differ — check your district before you design.
How much does a building permit cost in Minneapolis?
The building-permit fee is based on project valuation using a tiered schedule, plus a plan-review fee of roughly 65% of the permit fee and a state surcharge on the valuation (MPLS § 91.30; Minn. Stat. § 326B.148). Estimate your own with the Permit Fee Estimator — figures are a reference only, not a quote, so confirm the current fee with the City before you file.
Do I need a rental license in Minneapolis?
Yes — dwellings rented to others require a rental license, and inspection frequency follows a three-tier system (roughly every 8, 5, or 2 years) based on the property’s compliance history (MPLS Ch. 244, § 244.1790). Verify current requirements before renting.
When do I need a variance in Minneapolis?
Any deviation from a dimensional standard — a setback, height, or lot-coverage limit you cannot meet — generally requires a variance reviewed by the Board of Adjustment (MPLS § 537.110). The Variance / BZA Eligibility tool walks the filing path. This is general information, not legal advice; confirm what your project needs with the City before you file.
What is the maximum impervious surface allowed in Minneapolis?
Maximum impervious (hardscape) coverage runs from about 50% in R1 up to 75% in R4, by district (MPLS § 535.400). Separately, disturbing 5,000 sq ft or more of land triggers a stormwater management review regardless of coverage (MPLS Ch. 54). These figures are a reference only, not legal advice — verify your district and the current limits with the City before you build.